Post sponsored by NewzEngine.com

MIL OSI Translation. Region: Russian Federation –

Design decision

In the house of 161 apartments, including 20 one-bedroom and 121 two-bedroom and 20 two-bedroom.

In Northern Tushino began the interior decoration of the new house, which will move the participants the renovation program. This was announced by the head of The Department of construction of Moscow Andrey Bochkarev.

“In the area North Tushino on the address: Freedom street, possession 67, building 5 has begun the interior finish of residential houses for resettlement under the program of renovation. Currently, the device couplers, are tile work and plastering of the surfaces. To complete the construction we plan in the next year,” he said.

The house is built on an individual project. This two-section monolithic building with technical basement and public rooms on the ground floor.

The facades of the building in beige tones with bright red and yellow accents. They will install baskets for air conditioners. Loggia glazed.

The building has 161 apartments, including 20 one-bedroom and 121 two-bedroom and 20 two-bedroom. Total area of apartments will be 8 977,43 square meter.

Finishing in the apartments is fully consistent with the standards of the renovation approved the Moscow Government resolution dated August 8, 2017 No. 516-PP.

Almost 30 thousand Muscovites will move to new apartments by 2021 “Such an ambitious program in the world”: Moscow mayor Sergei Sobyanin about the interim results of the renovation

The lobby houses equipped with wheelchair, the room of the Concierge with a sanitary unit, a pantry for cleaning tools and place for mailboxes.

The territory near the building will plant and prosper: break lawns, planting trees and shrubs, and the yard will establish children’s playgrounds.

“Only in the North-West of Moscow in a program of renovation included 431 residential building with total area of 1.5 million square meters, and in the area Northern Tushino new apartments will be demolished, residents of 60 homes. For the beginning of the migration picked up three launch areas, also continue to work on the selection of new”, — said Andrey Bochkarev.

A renovation programme was approved in 2017. It includes 5173 houses in all districts of the capital. In new housing will move over a million Muscovites.

EDITOR’S NOTE: This article is a translation. Apologies should the grammar and or sentence structure will not be perfect.

MIL OSI Russia News