Post sponsored by NewzEngine.com

MIL OSI Translation. Region: Russian Federation –

Scheduled repair of large landing ship (BDK) “Olenegorsky miner” and the hydrographic ship (HS) “Romuald of Muklevich” will be completed by the end of 2019. This was announced by the commander of the Naval Fleet (Navy) of Russia Admiral Nikolai Evmenov as a result of the Admiralty meeting which addressed issues of repair and maintenance of ships and vessels of the Navy.

At the meeting the heads of relevant departments of the General command of the Navy reported to the Admiral Nicholas Evmenova about the scope of repair works on BDK “Olenegorsky miner” and GS “Romuald of Muklevich”. During the repair of these ships were made a number of basic works, as well as the renovation of the ship’s life support systems, mechanical parts, navigation systems and communications.

Technical supervision of repair BDK “Olenegorsky miner” and GS “Romuald of Muklevich”, as well as development of design documentation on more than 50 modernization works on these ships fulfilled the 51st Central design and technological Institute of ship repair, exercising the functions of a designer by the decision of the Ministry of defense of Russia.

Workshops on issues of ship repair in the interests of the Navy are conducted under the leadership of commander in chief of the Navy Admiral Nicholas evmenova weekly that allows you to keep your finger on the pulse of this important segment of maintaining technical readiness of ships and vessels at the desired level.

1 2 3 4 5

EDITOR’S NOTE: This article is a translation. Apologies should the grammar and/or sentence structure will not be perfect.

MIL OSI Russia News