Post sponsored by NewzEngine.com

MIL OSI Translation. Region: Russian Federation –

The building will hold the insulation of the facade, remodeling of buildings, replacement of roofing and engineering systems.

In wedding Palace No. 4 will host a major overhaul. Construction work will begin in the second quarter of this year.

“Now the building is in poor condition. You need to do a renovation, facade insulation, replacement of roofing and engineering systems. In the course of the overhaul of the structure will redevelop its premises, which will more efficiently and comfortably accommodate the employees and guests of companies”, — told in the complex of municipal economy of Moscow.

On the ground floor will have room for people with limited mobility. Its area is over 30 square meters. Here, the specialists equipped the room for brides.

Crystal chandelier in the ceremonial hall on the second floor will be restored, returning it to its original form. The walls will be painted in warm colors of two shades, and bearing columns will revet natural stone. This room can accommodate about 30 guests. The hall area of over 100 square meters.

EDITOR’S NOTE: This article is a translation. Apologies should the grammar and or sentence structure will not be perfect.

MIL OSI Russia News