Post sponsored by NewzEngine.com

MIL OSI Translation. Region: Russian Federation –

Photo by E. Samarin. Mos.ru

In the area of ​​Nagatinsky Zaton, it is planned to build a four-section building of variable number of storeys for 110 apartments.

Mosgosexpertiza approved the design documentation for the construction of a house with a single-level underground parking, which will appear on Sudostroitelnaya Street as part of renovation programs… The project was developed using information modeling (BIM) technologies. This was announced by the chairman of Moskomexpertiza Valery Leonov.

“It is noteworthy that the design solutions for this facility were developed using information modeling technologies. BIM modeling is used not only in design, but also in construction, facility equipment, maintenance and repair of a building. The information model provides for the collection and complex processing of all technological, architectural, design, economic and other information about an object, allowing it to be considered as a single information system. This project is one of the pilot projects within the framework of the renovation program; during its development, advanced technological solutions were used, which directly affects the quality and detail of its development, ”he said.

Thus, it is planned to build a four-section building of variable number of storeys (up to 12 floors) for 110 apartments. On the ground floor, in the non-residential part, there will be public premises. For example, it will be possible to open a public information center and a joint dispatch service there. The ventilated facade will be faced with clinker and porcelain stoneware tiles.

The apartments will have full comfort-class interior finishing. The floors will be laid with laminate, the walls will be covered with wallpaper. In addition, they will lay tiles in the bathrooms and partly in the kitchen. They will also install doors, sockets and lighting fixtures, plumbing fixtures, a kitchen sink and a stove.

Experts will landscaping and landscaping the adjacent territory. Parking lots, driveways, pedestrian zones and sidewalks with paving stones will appear near the house. There are children’s playgrounds and sports grounds, places for recreation.

For residents with limited mobility, ramps will be installed, wide pedestrian paths and tactile stripes will be applied. In addition, special recreation areas will be created – they will be equipped with awnings, lighting, benches, signs.

Renovation program was approved in 2017, it included 5,175 houses. The first million square meters of new housing have already been built.

Three kindergartens and two schools will be built under the renovation program in the Nagorny districtThe first house in Biryulevo West under the renovation program will begin to populate in the coming months

EDITOR’S NOTE: This article is a translation. Apologies should the grammar and or sentence structure not be perfect.

MIL OSI Russia News