Post sponsored by NewzEngine.com

MIL OSI Translation. Region: Russian Federation –

It will have 258 apartments: 46 one-room, 177 two-room and 35 three-room.

In the west of the capital, in the Solntsevo district, the construction of a residential building for resettlement under the renovation program is nearing completion. Now specialists are completing the final finishing, landscaping the courtyard areas, the head said Moscow Construction Department Rafik Zagrutdinov.

The residential building is being built according to an individual project and is located at Shchorsa Street, possession 15. The building consists of two sections. Its facades are clad with clinker-like tiles, galvanized sheet cassettes and wood-look porcelain stoneware. They are equipped with boxes for air conditioners. The first floor is decorated with stained-glass windows made of aluminum profiles with double-glazed windows.

The new building is designed for 258 apartments: 46 one-room, 177 two-room and 35 three-room. Their total area is 14,671.27 square meters. All apartments have glazed balconies.

The first floor of the house will be non-residential, shops, pharmacies, cafes, beauty salons, circles and sections can be accommodated here. The lobby will house an elevator lobby, a concierge room, a storage room for cleaning equipment, mailboxes and technical rooms. In each section of the house, lifts with a carrying capacity of 400, 630 and 1000 kilograms will be installed.

The entrance to the building, the floor of the lobby and the hall on the ground floor are tiled with rough tiles. It will prevent slipping at any time of the year, making it easier for baby carriages and bicycles to travel. People with limited mobility will also be able to enter the entrance without assistance.

The new building was equipped with security systems, access control and management, warning and evacuation control in case of fire, as well as fire alarm and video surveillance.

The adjacent territory will be landscaped and landscaped. Specialists will equip a playground and recreation areas. In addition, in addition to the underground one-story parking lot, the building will have parking spaces on the street.

“In Solntsevo, under the renovation program, residents of 43 houses with a total area of ​​more than 120 thousand square meters will receive new apartments. In total, four launch sites have been selected in the region, ”added Rafik Zagrutdinov.

Renovation program: residents of 47 houses in ZAO move to new apartmentsNine social facilities will be built in Solntsevo under the renovation program

The renovation program was approved in August 2017. Thanks to her, 350 thousand Moscow families can improve the quality of life. The first million square meters under the renovation program was built by December 2020.

EDITOR’S NOTE: This article is a translation. Apologies should the grammar and or sentence structure not be perfect.

MIL OSI Russia News