Post sponsored by NewzEngine.com

MIL OSI Translation. Region: Russian Federation –

March 25, 2021, 13:12

Share this

Photo by E. Samarin. Mos.ru

The building was built in 1949 and is an example of residential development in post-war Moscow.

This year, in the Shchukino district, the roof of a historic post-war building at 9 Marshal Konev Street will be repaired. overhaul programs.

The house was built in 1949 and is part of a residential area that was built in 1947-1952 by the architects Iza Kontorovich, V. Izvekov and Mikhail Kupovsky. The building is located in a block called the German Sloboda and is an example of mid-rise residential development in post-war Moscow. The decoration of the house belongs to the Stalinist neoclassicism style. The height of the ceilings in the rooms reaches three meters, the thickness of the partitions between the rooms is 70 centimeters. The building has two entrances – front and black. The façade has stucco moldings and small balconies, and there is a fountain in front of the house.

As part of the program, it is planned to completely change the covering of the pitched roofs of both houses and to repair the drainage system. Also, workers will insulate the attic floors, if this is provided for by the project documentation.

When repairing a roof, the entire old coating is dismantled, after which a new roof is made. All work will be carried out in accordance with applicable building codes and regulations.

When carrying out a comprehensive repair of pitched metal roofs, the attic floor will be insulated to restore the temperature and humidity conditions of the attic space, which increases the energy efficiency of the building as a whole and improves the operation of the roof.

When insulating the attic floor, they will use mineral wool slabs, which are considered a modern heat insulator. If necessary, the crate, rafters and mauerlat will be replaced, all wooden structures will be treated with fire retardant compounds, hatches, as well as exits to the attic and roof will be changed.

The goal of the regional overhaul programs– to plan and carry out major repairs of the common property of apartment buildings in a timely manner. Such works include the repair of the facade, elevators, roofs, foundations, cold and hot water supply systems, heating, gas supply and electricity supply.

Only contractors with special licenses from the Ministry of Culture of the Russian Federation are allowed to carry out repairs. During the overhaul, the facilities are regularly checked by specialists Department of Cultural Heritage of the City of Moscow… Construction control employees carry out operational, intermediate and acceptance monitoring.

An information stand is placed next to each facility being repaired. It contains the details of the contractor carrying out the repairs and the contact details of the authorized employees. Also, for all questions, you can contact the dispatch office of the Fund for the overhaul of apartment buildings in Moscow by phone: +7 (495) 695-64-20.

EDITOR’S NOTE: This article is a translation. Apologies should the grammar and or sentence structure not be perfect.

MIL OSI Russia News