Post sponsored by NewzEngine.com

MIL OSI Translation. Region: Russian Federation –

Specialists of the Military Construction Complex of the Russian Ministry of Defense will erect for servicemen on the Novaya Zemlya archipelago in the village of Novaya Zemlya. Belushya Guba has a new kindergarten and three residential buildings.

The development of military infrastructure in the Arctic was inspected by Deputy Defense Minister of the Russian Federation Timur Ivanov as part of a working trip to the Northern Fleet.

“The leadership of the Russian Defense Ministry pays special attention to the development of military infrastructure in the Arctic. In total, in the period from 2013 to the present, the specialists of the Military Construction Complex commissioned 791 buildings and structures, ”said Timur Ivanov.

By now, the design organizations of the Russian Ministry of Defense have already prepared sketches and design solutions for a new preschool institution to provide all the necessary material and technical base and organize the full development of children.

The project of a kindergarten for 360 children is adapted taking into account the special natural climatic conditions for the regions of the Far North. The building will be equipped with an assembly hall, speech therapist and psychologist offices, various circle rooms, a sports corner, a swimming pool and a winter greenhouse. It is planned to hand over the kindergarten by the end of 2020.

Also on Novaya Zemlya, construction of three residential buildings for military personnel and their families with a total capacity of 168 apartments is underway. The first new building is planned to be populated at the end of this summer.

In permafrost conditions, buildings are built on pile foundations using the latest technologies. First, a closed thermal circuit of the body is erected, this allows for internal construction and finishing work, and only after that the window and door openings are cut out.

Earlier, military builders have already built a comprehensive school here, which provided comfortable learning conditions for all children of military personnel.

It should be noted that all construction materials, special equipment and materiel are supplied to the region from the mainland of the country by the united transport and logistics operator Oboronlogistics.

In total, in 2020, about 6.6 thousand tons of various military cargoes were delivered to the Novaya Zemlya Archipelago alone.

Also, by the forces of military builders, a large-scale reconstruction of the base warehouse of fuels and lubricants is underway. Completion of construction will allow to fully meet the needs of the military camp with fuel. All work is carried out in strict accordance with environmental standards and requirements for maintaining the preservation of the environment.

1 2 3 4 5

EDITOR’S NOTE: This article is a translation. Apologies should the grammar and / or sentence structure not be perfect.

MIL OSI Russia News