Post sponsored by NewzEngine.com

MIL OSI Translation. Region: Russian Federation –

March 31, 2021 5:28 pm

Share this

Design solution

Currently, the installation of external and internal partitions, windows and utilities is underway.

A residential building for 187 apartments for relocation under the renovation program will be put into operation next year in Nagatinsky Zaton. The new building is located at Rechnikov Street, possession 18–20.

“Currently, work has been completed on the erection of a monolithic structure of the building, the installation of external and internal partitions, windows, utilities is underway,” the head said.

Moscow City Construction Department Rafik Zagrutdinov.

The house is being built according to an individual project. It will consist of two buildings, united by a common one-story stylobate. The facades will be faced with ceramic granite and fiber cement slabs. The bodies will be made in light colors with color accents on the baskets for the air conditioners, and the stylobate will be made dark. The first floor will have stained glass windows.

The house is designed for 187 apartments, including 27 one-room, 133 two-room and 27 three-room. Their total area will be 11,461.2 square meters.

The improved interior decoration will fully comply with the standards of the renovation program approved by the decree of the Moscow Government.

On the ground floor of the non-residential part of the house, shops, cafes, beauty salons, sports clubs, circles and sections for children can open. The lobby of the residential part includes a lobby, a stroller, a duty room, a storage space for cleaning equipment, technical rooms, and mailboxes.

Each section will be equipped with elevators with a carrying capacity of 400 and one thousand kilograms, they will be equipped with visual and tactile means of information.

The stylobate part will house a parking lot, infrastructure facilities and technical rooms.

The adjacent territory will be landscaped: lawns and flower beds will be laid out, trees and shrubs will be planted. In addition, a playground and a sports ground will be equipped in the courtyard.

The first million square meters of housing under the renovation program was built in Moscow

The renovation program was approved in August 2017. It includes 5175 houses. To implement the program, 472 launch sites were selected.

In accordance with uniform standards renovation programs Residents are provided with apartments with improved finishes, areas near the houses are landscaped, children’s playgrounds are installed in the courtyards and places for recreation are created.

More about the renovation program

EDITOR’S NOTE: This article is a translation. Apologies should the grammar and or sentence structure not be perfect.

MIL OSI Russia News