Post sponsored by NewzEngine.com

MIL OSI Translation. Region: Russian Federation –

April 2, 2021 12:04 pm

Share this

Specialists will completely renovate the wall cladding, ceiling, and stair coverings. Also, the transition is equipped for people with limited mobility.

A project for overhaul of an underground pedestrian crossing in Kashirsky proezd has been approved. In the passage, the wall cladding, ceilings, steps will be updated, as well as adapted for people with limited mobility, the chairman said. Moskomexpertiza Valery Leonov.

“The passage has two staircases, the length of its tunnel part is 32 meters, and the width is four. As part of the approved design solutions, they will dismantle the existing cladding of the transition, the aluminum structures of the suspended ceiling of the tunnel part and will perform new cladding of the walls, staircases, renovate the ceilings, the covering of the steps and the walkway. Then, an anti-vandal coating will be applied to the vertical surfaces. Doors will be replaced in office premises, walls and floors will be covered with ceramic granite tiles, walls and ceilings will be painted, ”the head of the department said.

Also, the transition will be adapted for people with limited mobility. There will be tactile signaling indicators, tactile surfaces and contrasting stripes on steps and stairwells. Wheelchair slopes will be replaced with granite ones and handrails will be installed at the gatherings.

In the transition, the pumping equipment and equipment in the switch room will be replaced, the power supply, drainage, water supply, ventilation and heating systems will be repaired.

EDITOR’S NOTE: This article is a translation. Apologies should the grammar and or sentence structure not be perfect.

MIL OSI Russia News