Post sponsored by NewzEngine.com

MIL OSI Translation. Region: Russian Federation –

April 6, 2021, 18:38

Share this

It will be possible to build 225.4 thousand square meters of housing on them.

The list of launch sites on which they plan to build houses for resettlement under the renovation program has increased by 12 addresses. The corresponding decree was signed by Sergei Sobyanin.

These sites are located in six administrative districts and 10 districts. It will be possible to build 225.4 thousand square meters of housing on them. These houses will help to resettle 45 five-story buildings with 3.2 thousand apartments. 8.2 thousand Muscovites will receive new comfortable housing.

Four out of 12 sites are located on the site of houses included in the renovation program. Thus, the Moscow Government continues to compile lists of houses that are being built as part of the second wave of the program.

In the meantime, there is no need to know about it. ”

County

District

Address or landmark

SAO

Savelovsky

2nd Khutorskaya street, possession 31a

North-East Administrative District

Alekseevsky

Kibalchicha street, possession 11, building 3 (buildings 2, 3, 4)

North-East Administrative District

Losinoostrovsky

Emerald street, possession 44, s / u 1

North-East Administrative District

Losinoostrovsky

Emerald street, possession 44, s / y 2

North-East Administrative District

Losinoostrovsky

Tayninskaya street, possession 16, building 1

North-East Administrative District

Ostankino

Bochkova street, possession 11a

HLW

Bogorodskoe

Playing street, estate 1

SEAD

Vykhino-Zhulebino

Tashkent street, house 14, building 1

SEAD

Ryazan

Ryazansky prospect, possession 49, building 1, 2, 3, 4

South Administrative District

Danilovsky

Derbenevskaya street, possession 22

South Administrative District

Nagatino-Gardeners

Nagatinskaya street, possession 1

TAO

Troitsk

Sports street, near property 9

One launch pad is excluded from the list – at the address: Novocheremushkinskaya street, possession 10, building 1 (Academic district, South-West Administrative District). There were found restrictions preventing construction.

In total, 500 launch sites have already been selected for the construction of new houses. They can be used to build 7, 9 million “squares” of housing.

5175 houses are included in the program of housing stock renovation. This is about 350 thousand apartments with a total area of ​​16.4 million square meters. They are home to about one million people.

The first resettlements took place in February 2018. Now the resettlement of residents of 244 houses in 84 new buildings is underway (or completed). In total, about 36 thousand Muscovites are moving to new housing.

In addition, 107 residential buildings with a total area of ​​1.3 million square meters were erected. Construction and design of 276 houses with a total area of ​​4.7 million square meters is underway.

EDITOR’S NOTE: This article is a translation. Apologies should the grammar and or sentence structure not be perfect.

MIL OSI Russia News