Post sponsored by NewzEngine.com

MIL OSI Translation. Region: Russian Federation –

April 16, 2021 09:11

Share this

Photo by E. Samarin. Mos.ru

Preventive work is planned to be completed by September 1.

Scheduled outages of hot water in Moscow will begin on May 11. They are related to preparations for the new heating season.

“Every year, scheduled shutdowns of hot water are carried out after the end of the heating season and in preparation for a new one. This is a necessary measure for high-quality hydraulic tests, which make it possible to identify possible unreliable sections of heating networks and take timely measures to liquidate them, “said the Deputy Mayor of Moscow for Housing and Utilities and Improvement

Peter Biryukov.

Preventive work on hot water supply systems is planned to be completed by September 1. During this time, hydraulic tests will be carried out on more than 16 thousand kilometers of networks.

Now the hot water cut-off period does not exceed 10 days.

“Previously, blackouts lasted 20 days or more, now the maximum period has been reduced to 10 days. It is impossible not to turn off the hot water at all, since in any system for its high-quality functioning it is necessary to periodically carry out planned preventive measures, ”stressed Pyotr Biryukov.

Alerts that will remind you about the disconnection of hot water in the house, you can configure on the mos.ru portal… Portal users have access to about 380 services and services. To use all services, you must have a full account. You can get it online, including with the help of a confirmed account on the gosuslugi.ru portal, as well as in any center of public services “My Documents”.

EDITOR’S NOTE: This article is a translation. Apologies should the grammar and or sentence structure not be perfect.

MIL OSI Russia News