Post sponsored by NewzEngine.com

MIL OSI Translation. Region: Russian Federation –

April 16, 2021, 13:44

Share this

The works are carried out within the framework of the month of spring improvement.

More than 8.5 thousand children’s and sports grounds in the capital will be put in order after winter. The work is planned to be fully completed by the end of April.

Specialists of the city services will clean the territories, thoroughly wash and repair sports and play equipment, update and paint small architectural forms, and replace the lost elements.

It is planned to bring more than 89 thousand swings, carousels, slides and exercise machines into proper condition. In addition, nearly 30,000 square meters of safe rubber surfaces will be repaired.

Repair of playgrounds and sports grounds is carried out within the framework of the month of spring improvement. Until April 30, they also plan to update the gazebos, paint and repair bins and benches, container platforms, equip lawns and flower beds, and plant trees and shrubs.

In residential buildings, plinths and facades, entrance doors, porches, canopies, staircases and railings will be cleaned and repaired, external drainage systems, lighting and heating devices will be put in order.

EDITOR’S NOTE: This article is a translation. Apologies should the grammar and or sentence structure not be perfect.

MIL OSI Russia News