Post sponsored by NewzEngine.com

MIL OSI Translation. Region: Russian Federation –

April 24, 2021 12:27 pm

Share this

Photo by Y. Ivanko. Mos.ru

Experts also take control measurements of structures to calculate the load and ensure the safe passage of the columns.

Specialists of the municipal economy complex additionally check the technical condition of 53 engineering structures located on the route of military equipment to the Victory Parade, said the Deputy Mayor of Moscow for Housing and Utilities and Improvement Peter Biryukov.

“There are 53 engineering structures on the route of military equipment – overpasses, bridges, flyovers, pedestrian and transport tunnels. Traditionally, every year before the parade, they are thoroughly examined, – he said. “Among them are Krylatsky, Karamyshevsky, Bolshoi Moskvoretsky and Bolshoi Kamenny bridges, Mozhaisky overpass and other objects.”

Pyotr Biryukov emphasized that specialists also carry out control measurements of structures in order to confirm the possibility of equipment passage, correctly calculate the load and ensure the safe passage of the columns.

EDITOR’S NOTE: This article is a translation. Apologies should the grammar and or sentence structure not be perfect.

MIL OSI Russia News