Post sponsored by NewzEngine.com

MIL OSI Translation. Region: Russian Federation –

Design solution

The construction of the new entrance pavilion is scheduled for completion in the second half of 2021.

Installation of travelators in the new entrance pavilion is nearing completion Moscow Zoo… This was announced by the head Moscow City Construction Department Rafik Zagrutdinov

Construction work is scheduled to be completed in the second half of 2021. Now a monolithic structure (box) of the building has been erected, internal walls and partitions have been built, finishing works are underway. The entrance pavilion will be a logical continuation of the existing ensemble.

Now you can get to the zoo through three entrances:

– the main entrance (Bolshaya Gruzinskaya street, building 1);

– additional entrance at the address: Bolshaya Gruzinskaya street, 1, building 103;

– additional entrance to the address: Bolshaya Gruzinskaya Street, 8, Building 26 (from Zoological Street).

A new additional entrance will appear a few meters from the Barrikadnaya metro station. The two-story pavilion will house ticket offices and turnstiles, souvenir shops, cafes and an educational center where cultural and educational events will take place.

Also on the territory of the zoo continues reconstruction of a pedestrian crossing across Bolshaya Gruzinskaya Street and the construction of the Pinnipeds pavilion. A pedestrian bridge across Bolshaya Gruzinskaya Street will connect the old territory of the zoo with the new one.

EDITOR’S NOTE: This article is a translation. Apologies should the grammar and or sentence structure not be perfect.

MIL OSI Russia News