Post sponsored by NewzEngine.com

MIL OSI Translation. Region: Russian Federation –

The duration of the work will be eight months.

A house will be repaired in the Konkovo ​​district on General Antonov street, the chairman said Moskomexpertiza Valery Leonov.

“Experts have issued a positive conclusion for major repairs in a nine-storey residential building on General Antonov Street, built in 1969 according to a standard design series II-57,” Valery Leonov said.

According to the project, specialists will repair facades, entrance lobbies, replace doors to entrances, install new mailboxes and numbered floor areas. In common areas, insulated metal vestibule doors equipped with a door closer will be installed, wall coverings in the hall and the vestibule of the first floor will be updated. The floor covering will be replaced in apartment halls, vestibules, interfloor spaces and staircases. Also, staircases and a garbage chute at the entrances will be repaired.

Outside, the building will be cleaned of paint, the facade and window slopes will be washed and painted, the walls will be treated with an antifungal agent, window sills will be replaced, door slopes will be cleaned and repaired, and the facade flagpole will be replaced. On the basement floor, the old ceramic tiles will be replaced with a new one, and the surface will be treated with an anti-fungal compound. In addition, the roof, loggias and basements will be renovated in the house.

Specialists will renovate main pipelines and risers of cold and hot water supply, main pipelines and risers of domestic sewage systems. In addition, the heating system will be completely replaced in the building.

The renovation works will take eight months.

EDITOR’S NOTE: This article is a translation. Apologies should the grammar and or sentence structure not be perfect.

MIL OSI Russia News