Post sponsored by NewzEngine.com

MIL OSI Translation. Region: Russian Federation –

In all branches of the FSBI “TsZhKU” of the Ministry of Defense of the Russian Federation for the Air Defense Forces, planned work has been launched to prepare for the heating period of 2021-2022.

By the beginning of the heating period, it is planned to prepare more than 600 boiler houses. A check of readiness for the heating season will be carried out in about 600 residential buildings.

Currently, preventive examinations of engineering systems and equipment of boiler houses, central heating points, engineering networks of heat, gas, water and power supply have been carried out. The work plan for the improvement of the courtyards of apartment buildings includes the repair of roads and sidewalks, work to improve children’s and sports grounds, as well as recreation areas.

All work is carried out within the framework of the formation of a favorable urban environment, which makes it possible to make the courtyards modern and comfortable, so that during the summer holidays, military families can organize recreation for children in their courtyards.

Recall that all branches are continuously working to improve life support systems, special attention is paid to the modernization of equipment, the introduction of energy-saving technologies at housing and communal services facilities, allowing to reduce energy costs, as well as improve the quality of services provided.

1 2 3 4 5

EDITOR’S NOTE: This article is a translation. Apologies should the grammar and / or sentence structure not be perfect.

MIL OSI Russia News