Post sponsored by NewzEngine.com

MIL OSI Translation. Region: Russian Federation –

Photo by M. Denisov. Mos.ru

The total area of ​​the facility is 6.68 thousand square meters.

In Krylatskoye, the building of a comprehensive school for 300 students was put into operation, the head of the capital Department of Urban Development Policy Sergey Levkin… It was built as part of the implementation of an investment contract for the design and complex residential development of the territory and is located at the address: Rublevskoe shosse, house 70, building 4.

The educational institution meets all modern standards. The building is equipped with classrooms for elementary and secondary schools, a medical block, a canteen, labor offices, assembly and sports halls, a library with a media library and administrative offices. The total area of ​​the facility is 6.68 thousand square meters.

At the end of last year, a built-in-attached kindergarten for 125 children was put into operation on the first floor of a residential building at the address: Rublevskoe shosse, 70, building 1.

Under the terms of the contract, the investor will transfer the kindergarten and school to the ownership of the city. The new building will open the state budgetary educational institution “School No. 1371” Krylatskoye “”.

Last year, 22 kindergartens and 14 schools were commissioned in the capital, and from the beginning of 2021 – nine more educational facilities.

History of the issue:

School for 400 places will be built in Prichalny Proezd Schools, kindergartens and clinics. What does the social infrastructure of Moscow get from investors?

EDITOR’S NOTE: This article is a translation. Apologies should the grammar and or sentence structure not be perfect.

MIL OSI Russia News