Post sponsored by NewzEngine.com

MIL OSI Translation. Region: Russian Federation –

As a result of the meeting, long-term development programs for PJSC ROSSETI and JSC SO UES were approved, as well as instructions were given on the issues of power supply to the Eastern range of railways of JSC Russian Railways.

Previous news Next news

Alexander Novak at a meeting of the Government Commission on the Development of the Electricity Industry

Deputy Prime Minister of the Russian Federation Alexander Novak chaired a meeting of the Government Commission on the development of the electric power industry. The agenda of the meeting concerned the approval of the draft long-term development program for PJSC ROSSETI and subsidiaries and dependent companies until 2030, the draft long-term development program for SO UES JSC for the period 2020–2024. In addition, within the framework of the meeting, a report was presented on the progress in the implementation of measures necessary to supply power to the Eastern range of railways of Russian Railways as part of a comprehensive plan for the modernization and expansion of the trunk infrastructure for the period up to 2024.

As a result of the meeting, projects of long-term development programs were approved. In addition, it was instructed to take all the necessary measures to accelerate the pace of design work and the timing of the start of construction and installation work in relation to facilities that are being built to provide power to the Eastern range of railways of Russian Railways, as well as to work out the issue of amending the list infrastructure facilities required to increase the capacity of the Baikal-Amur and Trans-Siberian railways.

EDITOR’S NOTE: This article is a translation. Apologies should the grammar and or sentence structure not be perfect.

MIL OSI Russia News