Post sponsored by NewzEngine.com

MIL OSI Translation. Region: Russian Federation –

Photo by D. Grishkin. Press Service of the Mayor and the Moscow Government

At the moment, the construction of a bridge across the Sosenka River and a section of the road network with a length of 1.66 kilometers has been completed.

On the territory of the Kommunarka administrative and business center (ADC), the construction of two overpasses over the Kaluzhskoe highway has begun. The work is being carried out as part of the first stage of the ADC transport infrastructure development. This was announced by the Deputy Mayor of Moscow in the Moscow Government for Urban Development Policy and Construction Andrey Bochkarev.

“At present, work has begun on the construction of two overpasses over the Kaluzhskoe highway and an extensive network of intra-block driveways. The work includes the construction of another tunnel-type overpass on the territory of the ADC, as well as the removal of engineering networks from the development spot, ”he said.

The construction of a bridge across the Sosenka River and a section of the road network with a length of 1.66 kilometers has already been completed. The construction of two treatment facilities for surface storm water is nearing completion.

The commissioning of this section of the road network with bridge construction is scheduled for the fourth quarter of 2021. The construction of intra-block thoroughfares is planned to be completed in 2022, and overpasses over Kaluzhskoe highway – in 2023. This will significantly improve the transport situation in the Sosenskoye settlement.

According to Yuri Kravtsov, General Director of Mosinzhproekt JSC, within the first stage, more than 18 kilometers of roads will be built, of which 4.82 kilometers have already been put into operation. Among them are two overpasses over the Solntsevo – Butovo – Varshavskoe highway.

As the head of the Department for the Development of New Territories of Moscow noted Vladimir Zhidkin, in Kommunarka they also plan to create a fitness center and an inter-museum multifunctional depository and exhibition complex. The area of ​​the first will be 19.5 thousand square meters. It will house an ice arena, swimming pools, halls for various sports, as well as the office of the Center for Physical Culture and Sports of the TyNAO. The total area of ​​the museum storage will be about 70 thousand square meters. It provides storage facilities for four federal and 16 Moscow museums, as well as a public space.

EDITOR’S NOTE: This article is a translation. Apologies should the grammar and or sentence structure not be perfect.

MIL OSI Russia News