Post sponsored by NewzEngine.com

MIL OSI Translation. Region: Russian Federation –

Photo by M. Denisov. Mos.ru

The specialists replaced the waterproofing and renewed the asphalt, applied road markings.

The repair of the road tiers of the North-West Tunnel has been completed. This was reported in the capital’s urban complex. The work has been carried out since June 13.

From June 13, traffic in the North-West Tunnel will be limited

The specialists replaced the waterproofing, renewed the asphalt, applied road markings.

Thanks to work around the clock, the repairs were completed ahead of schedule. At the same time, the movement of vehicles was not completely blocked, there were partial restrictions.

The North-West Tunnel is a unique design of three bunk tunnels. They connect Novorizhskoe highway and Marshal Zhukov avenue. The maximum laying depth is 44 meters.

The upper tiers – part of Marshal Zhukov Avenue – are intended for car traffic, while the lower tiers are trains of the Arbatsko-Pokrovskaya metro line.

EDITOR’S NOTE: This article is a translation. Apologies should the grammar and or sentence structure not be perfect.

MIL OSI Russia News