Post sponsored by NewzEngine.com

MIL OSI Translation. Region: Russian Federation –

In Vladivostok, in the Golden Horn Bay, technical work began on the installation of raid equipment for the formation of the parade formation of the Pacific Fleet ships for the Day of the Russian Navy.

In the water area of ​​the bay, in the area of ​​the Golden Bridge, the killer vessel KIL-498 and a hydrographic boat are operating. The latter corrects the accuracy of the installation of the roadstead “assemblies” at the points that were previously inspected by the divers of the Pacific Fleet rescue squad. The keel ship transports harbor equipment from the coastal storage base and forms mooring spaces for parade ships. Each of the raid kits is assembled taking into account the depth at the location.

In total, 13 sets of raid equipment have been prepared to support the parade of ships in the capital of the Primorsky Territory. Each complete assembly weighs 55 tons.

It is planned that by July 20, all roadstead kits will be installed in place and ready for mooring of warships.

1 2 3 4 5

EDITOR’S NOTE: This article is a translation. Apologies should the grammar and / or sentence structure not be perfect.

MIL OSI Russia News