Post sponsored by NewzEngine.com

MIL OSI Translation. Region: Russian Federation –

Photo by D. Grishkin. Press Service of the Mayor and the Moscow Government

The changes are related to the laying of the track on the Moscow-Butyrskaya – Beskudnikovo section.

There will be changes in the timetable of trains of the first Moscow Central Diameter (MCD-1), the Savelovsky direction of the Moscow Railway and aeroexpress trains to Sheremetyevo Airport. They will operate on July 17-18, July 24-25, July 31-August 1 from 00:01 Saturday to 12:00 Sunday. The departure and arrival times of a number of electric trains, as well as the number of stops on the route, will change. Some trains will be out of schedule.

This is due to the laying of a continuous welded track on the Moscow-Butyrskaya – Beskudnikovo section. The railway workers will perform a full cycle of work on the overhaul of the track – this is cleaning and adding crushed stone ballast, dismantling the old and laying a new rail and sleeper grid, straightening the track, welding a continuous track. The movement of trains on the site will be organized along the adjacent track.

In addition, on the sections Kanalstroy – Verbilki and Kanalstroy – Dmitrov, from 19 to 23 July, in the period from 09:50 to 15:00, work will be carried out to maintain the track infrastructure.

More information on the schedule of trains can be found on the website “Russian Railways”.

EDITOR’S NOTE: This article is a translation. Apologies should the grammar and or sentence structure not be perfect.

MIL OSI Russia News