Post sponsored by NewzEngine.com

MIL OSI Translation. Region: Russian Federation –

The crew of the Boris Pykhtin project 02690 marine self-propelled floating crane completed the installation of the roadstead equipment for the formation of the parade formation of ships in the water area of ​​the Kaliningrad Sea Canal in Baltiysk.

In the water area of ​​the Kaliningrad Sea Canal in Baltiysk, the installation of barrels (special mooring devices) has been completed, to which the ships of the Baltic Fleet will be moored. There are nine devices in the channel. Tomorrow, July 16, the formation of the parade formation of warships will begin.

In total, the events in Baltiysk will involve 50 battleships, support vessels, boats and high-speed boats of the Baltic Fleet, 20 units of military equipment of the army corps and naval corps, as well as 16 helicopters and naval aircraft.

1 2 3 4 5

EDITOR’S NOTE: This article is a translation. Apologies should the grammar and / or sentence structure not be perfect.

MIL OSI Russia News