Post sponsored by NewzEngine.com

MIL OSI Translation. Region: Russian Federation –

Servicemen of the consolidated group of engineering troops from the engineering brigade of the Central Military District (CVD) and the engineering unit from the Vladimir region installed 7 out of 13 ridged supports for the construction of bridges over the mountain rivers Ortaa-Khadan and Mogen-Buren in the Tyva Republic.

At the preparatory stage, military specialists cleared the coastal zone from debris, prepared a bulk foundation and are currently installing cricket supports. The next stage of work will be the installation of heavy MT-55 axle sets on the supports and their testing.

Metal structures were delivered to the bridge construction site using Mi-26 and Mi-8 helicopters of the Central Military District Army Aviation.

The event involved about 100 military personnel, as well as more than 20 pieces of engineering equipment, including bulldozers, excavators and truck cranes.

1 2 3 4 5

EDITOR’S NOTE: This article is a translation. Apologies should the grammar and / or sentence structure not be perfect.

MIL OSI Russia News