Post sponsored by NewzEngine.com

MIL OSI Translation. Region: Russian Federation –

During the visit of the Deputy Prime Minister to AO Mosgaz, a ceremony was held to launch the tunnel-boring shield for the re-laying of the Kutuzovsky pipeline siphon and a video conference with representatives of the Sibdalvostokgaz Association of Gas Facilities of Siberia and the Far East.

Previous news Next news

Alexander Novak visited the Central Dispatch Office at Mosgaz JSC

Alexander Novak visited JSC Mosgaz, launched the reconstruction of the Kutuzovskiy gas pipeline-siphon and held a meeting on the basis of the company with representatives of the Sibdalvostokgaz Association of Gas Facilities of Siberia and the Far East.

Petr Biryukov, Deputy Mayor of Moscow for Housing and Utilities, Vyacheslav Torsunov, Head of the Moscow Department of Housing and Utilities, and Gasan Gasangadzhiev, General Director of Mosgaz, presented the prospects for the development of the gas supply system in the capital.

The Deputy Prime Minister examined exhibitions of gas equipment and one-stop-shop services of JSC Mosgaz, visited the Central Dispatch Office and the Emergency Recovery Department of the company, and assessed the level of digitalization of Moscow’s gas facilities.

“Today in Moscow we are witnessing the highest level of digitalization in the industry. One of the most advanced tools for managing gas networks is a geographic information system plotted on the grid of Moscow. I believe that such a mechanism should work in every gas distribution company in Russia, this increases the efficiency of the gas distribution control system, ”stressed Alexander Novak.

The Deputy Prime Minister, via videoconference, launched the shield tunneling of the Kutuzovsky gas pipeline – one of 13 high and medium pressure siphons built in 1939-1965 and requiring comprehensive reconstruction. The connection of the renovated facility to the Moscow gas distribution network is scheduled for October 2022.

The Vice Prime Minister got acquainted online with the progress of the construction of the high-pressure gas pipeline and the Likovsky hydraulic fracturing plant for the gasification of the Filimonkovskoye and Pervomayskoye settlements (TyNAO).

The Deputy Prime Minister held a video conference on the basis of Mosgaz with representatives of the Sibdalvostokgaz Association of Gas Facilities of Siberia and the Far East.

The Sibdalvostokgaz Association was founded in 1995 and unites more than 60 gas facilities and enterprises, design and research institutes, manufacturers of gas equipment in Siberia, the Far East, central and southern regions of Russia.

EDITOR’S NOTE: This article is a translation. Apologies should the grammar and or sentence structure not be perfect.

MIL OSI Russia News