Post sponsored by NewzEngine.com

MIL OSI Translation. Region: Russian Federation –

Its length will be approximately 100 meters.

Moskomarchitecture approved the project of an elevated pedestrian bridge across the Solntsevo – Butovo – Varshavskoe highway. According to the chief architect of Moscow Sergey Kuznetsov, The building will be located near Alexandra Monakhova street.

“The transition will be made with the maximum possible percentage of glazing, white metal cassette trim. As a result, we will get a visually light structure that will allow you to comfortably cross the track and at the same time look pleasant. The project is being implemented as part of the construction of transport interchanges on this highway, on the section from the Stolbovo TPU to Polyana Street, “said Sergei Kuznetsov.

The span of the crossing will be about 100 meters long. It will be equipped with three staircases. The total building area is about 1000 square meters. A car up to five meters high can pass under the bridge. Inside, the passage will be about four meters wide and about three meters high. The stairs will be equipped with wheelchair ramps.

The Solntsevo – Butovo – Varshavskoe highway is currently being built. The first section of the highway from Kievskoye to Kaluzhskoye shosse was opened in 2018. A year later, the second section was launched – from Kaluzhskoye Highway to Alexandra Monakhova Street. It is planned to complete work on all four sections and start traffic on the new road in 2024.

Roads, schools, metro stations. 10 interesting facts about the life of the TyNAO

EDITOR’S NOTE: This article is a translation. Apologies should the grammar and or sentence structure not be perfect.

MIL OSI Russia News