Post sponsored by NewzEngine.com

MIL OSI Translation. Region: Russian Federation –

The branch of the FSBI TsZhKU of the Russian Ministry of Defense for the Baltic Fleet (BF) has started to carry out test furnaces in preparation for the heating period of 2021-2022. Currently, 51 out of 276 boiler houses have been tested the operation of the systems.

During this period, the specialists of the housing and communal services of the branch carry out a comprehensive inspection of socially significant infrastructure facilities of the Ministry of Defense. Also, the heating systems of barracks, canteens, medical centers and other facilities located in the service area are flushed. At the same time, work is underway to restore the thermal circuits of buildings and structures.

In preparation for the heating period 2021-2022. interaction with the bodies of municipalities of the Kaliningrad region, with the bodies of the military prosecutor’s office of the Baltic Fleet has been organized. The management of the Baltic Fleet branch of the Federal State Budgetary Institution TsZhKU of the Russian Ministry of Defense has not identified any problematic issues at present, the preparation of facilities is being carried out ahead of schedule.

The standard fuel supply is created in accordance with the supply plan for the winter heating period 2021-2022.

The overall readiness of objects for the heating season is 88%.

Currently, more than 2,400 objects of barracks and housing stock, 255 communal facilities and more than 517.1 km of engineering networks have been prepared.

1 2 3 4 5

EDITOR’S NOTE: This article is a translation. Apologies should the grammar and / or sentence structure not be perfect.

MIL OSI Russia News