Post sponsored by NewzEngine.com

MIL OSI Translation. Region: Russian Federation –

The general readiness of objects for the heating period is more than 90%, today 2,547 objects of barracks and housing stock, 279 communal facilities, 547.3 km of engineering networks have already been prepared. At present, 106 out of 276 boiler houses have been tested with test furnaces.

In preparation for the heating season, specialists of the housing and communal services of the branch of the Federal State Budgetary Institution “TsZhKU” of the Ministry of Defense of the Russian Federation in the Baltic Fleet are conducting a comprehensive check of socially important infrastructure of the Ministry of Defense; located in the service area. Work was carried out to restore the thermal circuits of buildings and structures.

On the issue of preparation for the heating period 2021-2022. 14 interdepartmental meetings were held with the bodies of municipalities of the Kaliningrad region, 6 meetings with the bodies of the military prosecutor’s office of the Baltic Fleet. Based on the results of the meetings, protocols were drawn up, no problematic issues were identified, the preparation of facilities is being carried out ahead of schedule.

The standard fuel supply is created in accordance with the Fuel supply plan for the winter heating period 2021 – 2022.

1 2 3 4 5

EDITOR’S NOTE: This article is a translation. Apologies should the grammar and / or sentence structure not be perfect.

MIL OSI Russia News