Post sponsored by NewzEngine.com

MIL OSI Translation. Region: Russian Federation –

August 31, 2021 11:11 am

Share this

Photo by M. Denisov. Mos.ru

The area of ​​the two-storey building is 24.4 thousand square meters. Children from the first to the 11th grade will study here.

A school was built as part of a residential complex in the village of Ostafyevo. The investor has already received an opinion on the compliance of the facility with the requirements of technical regulations and project documentation. This was reported by Anastasia Pyatova, Chairman of Moskomstroyinvest.

“The constructed school is designed for 750 students from the first to the 11th grade. After commissioning, the facility will be transferred to the city’s balance sheet. Children from both the residential complex and the entire district will be able to study at the school, ”she explained.

The two-storey building with a total area of ​​24.4 thousand square meters consists of two blocks connected by a passage. The school is equipped with classrooms, an assembly hall, workshops, laboratory assistants, a sports block, classrooms for labor and art, there is a library and an engineering class.

On the territory there are sports zones, playgrounds for active games and quiet recreation, as well as an educational and experimental zone with an area of ​​1.1 thousand square meters.

The school became the second educational facility that the investor built under an agreement with the city. Since 2011, they have erected in the capital more than 430 schools and kindergartens.

EDITOR’S NOTE: This article is a translation. Apologies should the grammar and or sentence structure not be perfect.

MIL OSI Russia News