Post sponsored by NewzEngine.com

MIL OSI Translation. Region: Russian Federation –

August 31, 2021 12:19 pm

Share this

Photo by M. Mishin. Press Service of the Mayor and the Moscow Government

Equipment that supplies heat and hot water to more than 4.5 thousand educational institutions has been prepared.

All educational institutions of the capital before the start of the academic year are fully prepared for the new heating season. This was announced by the Deputy Mayor of Moscow for Housing and Communal Services and Improvement Peter Biryukov

“Specialists of the municipal economy complex have completed work on the preparation of equipment and networks that provide heat supply to the education system. At present, equipment has been prepared for the heating season that supplies heat and hot water to more than 4.5 thousand buildings of schools, kindergartens and other educational institutions, ”he said.

All measures for the preparation of the city heat supply system will be completed by September 1.

According to the head of the department, in total, more than 74 thousand objects will be prepared, including over 34 thousand apartment buildings, 8.9 thousand social facilities and 30.5 thousand administrative and non-residential buildings.

How to properly replace batteries in an apartment

For more than 10 years in a row, timely and high-quality preparation for the heating season has allowed the capital to do without serious accidents and shutdowns, said Pyotr Biryukov.

Yearly scheduled preventive maintenance carried out at more than 22 thousand heat points, inspected over 13 thousand kilometers of water supply networks, more than 116 thousand kilometers of electrical networks, about 21 thousand transformer and distribution substations.

EDITOR’S NOTE: This article is a translation. Apologies should the grammar and or sentence structure not be perfect.

MIL OSI Russia News