Post sponsored by NewzEngine.com

MIL OSI Translation. Region: Russian Federation –

Specialists of the housing and communal service No. 3 (Krasnodar) of the branch of the Federal State Budgetary Institution (FSBI) “Central Housing and Communal Administration” (“TsZhKU”) of the Russian Ministry of Defense for the Southern Military District (YuVO) completed a complex of work on the overhaul of on-site drainage networks at the 419th military hospital in Krasnodar.

“The works on soil development, arrangement of sewer wells, laying of gravity pipelines, replacement of grease traps, replacement of curb stones, asphalting of the territory have been completed,” said Evgeny Korchagin, head of housing and communal services No. 3.

Thanks to the well-coordinated work of the employees of the housing and communal service No. 3 (Krasnodar) and the construction technologies contractor, all work was completed on time. During the repair, 7 units of special equipment were involved.

The completed overhaul of sewerage networks is an important part of the timely and planned preparation of water supply and sewerage facilities for the autumn-winter season to ensure a stable heating period of 2021-2022.

1 2 3 4 5

EDITOR’S NOTE: This article is a translation. Apologies should the grammar and / or sentence structure not be perfect.

MIL OSI Russia News