Post sponsored by NewzEngine.com

MIL OSI Translation. Region: Russian Federation –

September 8, 2021, 17:18

Share this

The new building has 168 apartments, two of which are equipped for people with limited mobility.

In the Losinoostrovsky district, a house was commissioned under the renovation program. The new building is located at Tayninskaya street, house 13, building 1.

“The house was equipped with smart household and apartment metering devices for cold and hot water supply, heat supply, electricity with the ability to automatically transfer data to city information systems, which will significantly reduce the cost of operating the house and utility bills,” said the head

Moscow City Construction Department Rafik Zagrutdinov

The one-section building with underground parking is designed for 168 apartments – 57 one-room, 93 two-room and 18 three-room. Two of them were equipped for residents with limited mobility – they increased the width of the corridors and doorways, installed special plumbing. The finished improved finishing fully complies with the standards of the renovation program approved by the decree of the Moscow Government.

The main color of the facade is beige. The balconies and the façade of the first two floors will be brown. There are also boxes for air conditioners.

In the lobby of the residential part, there was a stroller, a concierge room, a storage room for storing cleaning equipment and a mailbox area. Three elevators were installed in the house: one with a carrying capacity of 1000 kilograms and two – 400 kilograms. They will be equipped with visual and tactile media.

The entrance to the building, the floor of the lobby and the elevator hall on the ground floor were made on the same level with the surface of the ground so that residents with limited mobility could get into the staircase without assistance. A tile with a rough surface will resist slipping at any time of the year.

The adjoining territory was put in order. Experts planted trees and shrubs, laid out lawns and flower beds, equipped a playground and sports grounds, as well as a recreation area.

“Residents of the resettled houses will not have to transfer their children to other schools or kindergartens – everything is close by. At the end of the year, it is planned to start resettlement of 128 families in the new building – 341 residents of houses 5, 11 and 13 on Taininskaya Street. In total, 68 houses are included in the renovation program in Losinoostrovsky District. More than 12 thousand residents should move to new apartments. 14 launch sites with a total capacity of 127.2 thousand square meters of housing have been identified in the region, ”added Rafik Zagrutdinov.

The renovation program was approved in the capital in 2017, it included 5175 houses. About a million people will receive new apartments.

EDITOR’S NOTE: This article is a translation. Apologies should the grammar and or sentence structure not be perfect.

MIL OSI Russia News