Post sponsored by NewzEngine.com

MIL OSI Translation. Region: Russian Federation –

September 12, 2021, 09:05

Share this

Photo by M. Denisov. Mos.ru

The building consists of two main blocks and is designed for 30 classrooms.

A school for 750 students was built in the Ryazanovsky settlement. They plan to transfer it to city property.

“The total area of ​​a two-storey school building with one underground floor is 24.2 thousand square meters. The school is designed for 30 classes. The building consists of two main blocks connected to each other. On the ground floor, there are groups of classrooms, an extended-day game room, classrooms, workshops, laboratory assistants, methodological rooms, an assembly and sports halls, a dining room. On the second floor, in addition to classrooms, there will be classrooms for labor, artistic creativity, a library, an engineering class, rooms for circles, “said

Head of the Department of Urban Development Policy of the City of Moscow Sergey Levkin

A sports area was set up on the school grounds. At the disposal of students is a playing field, treadmills, a long jump pit, sports grounds for playing basketball, volleyball and other sports.

In turn, the Deputy Mayor of Moscow for Urban Development Policy and Construction Andrey Bochkarevsaid that about 40 percent of social facilities in Moscow are being built at the expense of investors.

“The principle of integrated development of all districts and districts, without exception, is being implemented in Moscow. Investors are taking an active part in this – they are building not only housing, but also social infrastructure facilities, ”he added.

The city continues to actively build educational institutions. In the next three years, they plan to build about a hundred kindergartens and schools. In total, 8.5 million square meters of real estate are going to be built in the capital this year.

EDITOR’S NOTE: This article is a translation. Apologies should the grammar and or sentence structure not be perfect.

MIL OSI Russia News