Post sponsored by NewzEngine.com

MIL OSI Translation. Region: Russian Federation –

13 September 2021, 10:03

Share this

The repairs were carried out on Sadovnicheskaya, Raushskaya and Kosmodamianskaya embankments, Sadovnicheskaya street and in the 2nd Raushsky lane.

On Balchug Island, seven facades were repaired as part of a comprehensive improvement. The works were carried out on Sadovnicheskaya, Raushskaya and Kosmodamianskaya embankments, Sadovnicheskaya street and in the 2nd Raushsky lane. This was reported in the capital’s urban complex.

The facades were cleaned of dust, dirt and paint deposits, then cracks were repaired, puttyed and primed. The surface was treated with an antiseptic compound and painted with facade paint in accordance with the color passport. This is a document that contains the color schemes and historical characteristics of the house.

Over the past year, as part of improvement programs in the capital, the facades of 52 houses were repaired.

Complex works on Balchug Island were completed by the City Day. Embankments after improvement opened by Sergei Sobyanin… As a result, nine kilometers of comfortable walking routes along the water have appeared in the center of Moscow.

There is more greenery on the island. There they laid over 59 thousand square meters of lawns and laid out 6.4 thousand square meters of flower beds. In the fall, it is planned to plant almost 600 trees, including European lindens, red maples, elms and ornamental apple trees, as well as more than 11 thousand shrubs.

Improvement of Balchug Island is the largest project of the year to create a high-quality urban space in the center of Moscow.

EDITOR’S NOTE: This article is a translation. Apologies should the grammar and or sentence structure not be perfect.

MIL OSI Russia News