Post sponsored by NewzEngine.com

MIL OSI Translation. Region: Russian Federation –

September 15, 2021, 14:01

Share this

All heating networks are properly prepared.

In the capital, heating was turned on in more than half of residential buildings, said the Deputy Mayor of Moscow for housing and communal services and improvement. Peter Biryukov.

“On Monday, the heating season began in the city at the direction of the Mayor of Moscow. As of 12:00 on September 15, heat is supplied to more than 50 percent of residential buildings and 63 percent of social facilities, ”he said.

He recalled that the procedure for turning on the heating is not one-step, it takes several days. The technological period is five days. Social facilities, residential buildings and office buildings receive heat first. Then the turn comes to the enterprises of trade and industry.

Now city services are fully prepared for the heating season. “All heating networks were prepared properly, hydraulic tests were carried out in accordance with the approved plan, the identified unreliable sections of the networks were repaired,” said Pyotr Biryukov.

In addition, during the preparation for the autumn-winter season, fuel reserves were created in the city – 365 thousand tons of coal, 378 thousand tons of fuel oil and 24.9 thousand tons of diesel fuel.

All buildings and structures of the capital have been prepared for the heating season – about 74 thousand objects in total. Detailed information about this can be obtained by calling to a special hotline by phone: +7 (800) 100-23-29.

EDITOR’S NOTE: This article is a translation. Apologies should the grammar and or sentence structure not be perfect.

MIL OSI Russia News