Post sponsored by NewzEngine.com

MIL OSI Translation. Region: Russian Federation –

In Kamchatka, preparatory measures have been completed at the facilities of the Troops and Forces in the Northeast and the Submarine Forces of the Pacific Fleet for the heating season 2021-2022.

Preventive work has already been fully carried out on heating mains and heating networks in formations, military units and subunits, including those deployed on the shores of the Okhotsk and Bering seas of the Pacific Ocean, on Wrangel Island and Cape Schmidt.

Trial start-ups of boiler houses have been carried out, and in the near future the filling of heating mains and heating networks will begin.

The repair and preparatory teams formed in the units and ZhKO No. 3 carried out work at more than 100 thermal facilities. The teams are fully provided with spare parts and consumables purchased under government contracts across the entire range.

The heating season in military units began along with civilian objects from September 16, 2021 in accordance with the Decree of the Government of the Kamchatka Territory.

1 2 3 4 5

EDITOR’S NOTE: This article is a translation. Apologies should the grammar and / or sentence structure not be perfect.

MIL OSI Russia News