Post sponsored by NewzEngine.com

MIL OSI Translation. Region: Russian Federation –

September 21, 2021 10:04 am

Share this

Photo by M. Denisov. Mos.ru

This is due to the repair and road works, as well as the construction of the metro.

From September 20 to December 25, traffic on the section of the 2nd Chernogryazskaya Street is restricted due to engineering work.

On September 25, from 01:30 to 05:30, one lane on Krasnobogatyrskaya Street will be blocked due to road works.

From September 27, 2021 to January 29, 2022, the side passage of Leninsky Prospekt will be blocked at the intersection with Obrucheva Street. The site will be closed due to the construction of the metro.

From September 27, 2021 to April 29, 2022, due to engineering work, traffic will be limited in the side driveway of Dmitrovskoye Highway in the area of ​​house 47, building 3.

For the same reason, from September 29, 2021 to April 30, 2022, traffic in the 1st Nizhnelikhoborsky passage will be limited.

Also, due to engineering work until December 1, traffic in the 1st Volokolamsky passage and on Marshal Konev street is limited around the clock. Until December 15, some areas in Kostyansky, Seliverstov and Maly Golovin lanes have been closed. This is due to the implementation of engineering work.

EDITOR’S NOTE: This article is a translation. Apologies should the grammar and or sentence structure not be perfect.

MIL OSI Russia News