Post sponsored by NewzEngine.com

MIL OSI Translation. Region: Russian Federation –

September 21, 2021 2:24 pm

Share this

Photo by E. Samarin. Mos.ru

The corresponding decree was signed by Sergei Sobyanin.

V renovation program included another house at the address: Antonova-Ovseenko Street, Building 2, Building 1. At the same time, it was excluded from the regional capital repair program. The corresponding decree was signed Sergei Sobyanin

The five-storey building was built in 1960; its area is 2.5 thousand square meters. 45 families live here.

On June 30, 2017, a general meeting of apartment building owners was held, in which 70.22 percent of apartment owners took part. For inclusion of the building in the renovation program, 68.75 percent of the votes were cast, another 1.47 percent were against. However, two votes were not counted and doubts arose about the presence of a quorum (the required minimum number of voters). The protocol was invalidated, and the house was not included in the program’s list.

In March this year, the Moscow City Court made a decision, according to which the city must re-consider the application of the owners. Since most of the apartment owners were in favor, it was decided to include the house in the renovation program.

Thus, since September 21 this year, 5176 houses have been included in the program in the capital – this is about 350 thousand apartments with a total area of ​​16.4 million square meters, in which about one million Muscovites live.

Sergei Sobyanin spoke about the implementation of the renovation programThe renovation program is already being implemented in more than 50 districts of Moscow

For the implementation of the program, 523 launch sites were selected, and 8.3 million square meters of housing will be built on them. They are located in all administrative districts of the city as close as possible to the five-story buildings, the residents of which are planning to provide new apartments.

Already, 145 new houses have been built with a total area of ​​1.9 million square meters. The design and construction of 299 houses with a total area of ​​5.4 million square meters is underway.

Social infrastructure facilities are also being built in the districts, including kindergartens, schools, cultural centers and others. The area around the houses is landscaped, creating a modern comfortable space, including installing charging device for electric vehicles.

EDITOR’S NOTE: This article is a translation. Apologies should the grammar and or sentence structure not be perfect.

MIL OSI Russia News