Post sponsored by NewzEngine.com

MIL OSI Translation. Region: Russian Federation –

Housing and communal services No. 6 (Krasnodar) of the branch of the Federal State Budgetary Institution “TsZhKU” of the Ministry of Defense of Russia for videoconferencing in preparation for the heating season prepared 100% of the facilities of the barracks and housing stock and water supply and sewerage facilities, 71 thermal facilities and more than 80 km of heating networks …

In accordance with the plan of current repairs, repair teams have been created for videoconferencing at the production sites of the housing and communal service No. 6 of the branch of the Federal State Budgetary Institution TsZhKU of the Ministry of Defense of the Russian Federation.

Maintenance of boiler equipment, flushing of internal heating systems of buildings and structures, hydraulic testing of engineering networks is being carried out, acts of readiness of heating facilities, water supply and sewerage facilities and barracks and housing stock are signed.

The management of the housing and communal service is confident that, thanks to the timely and high-quality work to prepare for the winter, the upcoming heating season will pass without accidents, and the facilities of the Ministry of Defense will be provided with communal resources in full.

1 2 3 4 5

EDITOR’S NOTE: This article is a translation. Apologies should the grammar and / or sentence structure not be perfect.

MIL OSI Russia News