Post sponsored by NewzEngine.com

MIL OSI Translation. Region: Russian Federation –

The house was handed over for occupancy in May this year, it has 135 apartments.

In Khoroshevo-Mnevniki, the first new building in the district, erected under the renovation program, is being populated. It is located at 22 Demyan Bedny Street. Sergei Sobyaninexamined it and talked to the residents.

“Renovation has also come to Khoroshevo-Mnevniki, this is the first house built for the program participants. We relocated some of the townspeople who lived near the Narodnoe Opolchenie metro station. In addition to the fact that a renovation program is being implemented in the district, a new metro station has also been built. In general, on the whole, of course, this is a large volume of resettlement. In the area of ​​155 houses will be resettled, a significant amount. In Khoroshevo-Mnevniki, 10 launch sites have been selected for the district, which is not bad, ”said Sergei Sobyanin.

In Khoroshevo-Mnevniki, 10 launch sites were selected with a total area of ​​143.8 thousand square meters of housing. The construction of three houses has already been completed.

A new building on Demyan Bedny Street was handed over for occupancy in May this year. Construction work has been completed in two houses and it is planned to start moving residents. The buildings are located at 6a Mnevniki Street and 22a Karamyshevskaya Embankment. Eight more facilities are under construction or under design.

“So we are doing everything for those who live nearby, so that they feel comfortable, we will find good houses for resettlement, everything will be built, no one needs to worry,” added the Mayor of Moscow.

Resident comfort and modern urban environment

Monolithic 16-storey building with underground parking on Demyan Bednogo street was built according to an individual project.

The facades were fitted with brick-faced hinged panels, as well as metal baskets for air conditioners. Loggias and balconies are glazed.

The new building has 135 apartments, including 30 one-room, 76 two-room and 29 three-room. Their total area is 7.8 thousand square meters. In all rooms, finishing work was carried out taking into account renovation program standards

 

The house is equipped with an underground parking, which can be reached by an elevator. Residents will be able to purchase a parking space here with a 40 percent discount.

On the ground floor, with a modern stained-glass glazing system, there are technical services, wheelchairs, concierge rooms and office premises.

The new building was equipped with smart general house and apartment-based metering devices for cold and hot water supply, heat supply, electricity with the possibility of automatic data transmission to city information systems. They allow you to reduce the cost of house maintenance and utility bills.

The house has modern automatic video surveillance, fire alarms and other security systems.

The adjacent territory has been landscaped: it will be comfortable for all residents, including small children and people with limited mobility.

There are park areas nearby, as well as schools, kindergartens, a clinic and shops. In addition, in April this year, a new Narodnoe Opolchenie station of the Big Circle Metro Line was opened on Marshal Zhukov Avenue. The way to it will take about eight minutes.

In the quarter where the new building is located, it is planned to build three social infrastructure facilities: a general education school, a kindergarten and a fitness center with an underground parking lot.

Not only square meters: how new buildings differ from five-story buildings

Since May 29 of this year, 64 families are moving into a new house – these are 155 residents of the neighboring house built in 1966 (16 Demyan Bednogo Street).

The Resettlement Information Center is located on the first floor of the new building, where new settlers can receive the necessary assistance when moving. Now 63 families (98 percent) have agreed to receive housing, another family is choosing an apartment.

Yulia Gagina became one of the first residents of the house. She recently moved from a 40.4 square meter two-room apartment on the second floor of the house to be moved to a new 55.5 square meter two-room apartment on the seventh floor.

Among the new settlers is the family of Anastasia and Mikhail Andreenkov with two children aged nine and three, who moved from a two-room apartment with an area of ​​40.4 square meters on the second floor of an old house to a new two-room apartment with a total area of ​​59.1 square meters on the 16th floor.

And the family of pensioners Vladislav and Svetlana Yagupolsky, living with Vladislav’s mother, Lyudmila Sergeevna, decided to improve their living conditions by purchasing additional space. They moved from a two-room apartment with an area of ​​40.4 square meters to a three-room apartment with a total area of ​​75.5 square meters.

How the renovation program is being implemented in Moscow

The renovation program was approved in August 2017. It concerns 5176 houses, which contain 350 thousand apartments with a total area of ​​16.4 million square meters. Thanks to her, housing conditions will be able to improve about one million Muscovites.

The first program participants received new apartments in February 2018. Today, residents of 311 houses have already moved or are moving. 113 houses were built for them. The resettlement affected 47.6 thousand citizens, of whom 39.1 thousand already live in new apartments.

The specialists of the population information centers provide assistance to the program participants at all stages of paperwork. Here you can get advice from representatives of the City Property Department, the Moscow Renovation Fund, the prefecture, the management company, the general contractor and others. If necessary, program participants are provided with loader services when moving. In addition, newcomers can take advantage of useful online services

Before the first tenants: how is the final check of houses under the renovation program going? Almost 10 thousand families have used the service “Assistance when moving”

For the implementation of the renovation program, 523 launch sites were selected with a total area of ​​8.3 million square meters of housing. They are located in all administrative districts of the city as close as possible to the five-story buildings to be settled.

Today, 145 new houses with a total area of ​​1.9 million square meters have been built in the capital. Another 299 facilities with a total area of ​​5.4 million square meters are under construction or design.

EDITOR’S NOTE: This article is a translation. Apologies should the grammar and or sentence structure not be perfect.

MIL OSI Russia News