Post sponsored by NewzEngine.com

MIL OSI Translation. Region: Russian Federation –

Specialists of the housing and communal service No. 6 (Stavropol) of the branch of the Federal State Budgetary Institution (FSBI) Central Housing and Communal Administration (TsZhKU) of the Russian Ministry of Defense for the Southern Military District (YuVO) are completing the preparation of facilities for the autumn-winter season.

In the process of preparing the housing stock on the street. Gornaya completed work on pumping groundwater from basements, flushing and pressure testing of heating systems in 14 houses, maintenance of valves in basements, 10 sq. m of glazing in the entrances.

In addition, the general building engineering systems of hot and cold water supply (159 m), sections of sewerage networks were repaired, 35 sq. m blind area and 420 sq. m of soft roofs of houses. 10 valves were changed and
200 lin. m of power supply networks, 30 pcs. automatic switches. A stock of material and technical resources has been formed to prevent and eliminate emergencies.

Specialists of the housing and communal service No. 6 of the branch of the Federal State Budgetary Institution “TsZhKU” of the Ministry of Defense of Russia in the Southern Military District are taking comprehensive measures to ensure the stable operation of the heating network and heat generating complex in winter conditions.

1 2 3 4 5

EDITOR’S NOTE: This article is a translation. Apologies should the grammar and / or sentence structure not be perfect.

MIL OSI Russia News