Post sponsored by NewzEngine.com

MIL OSI Translation. Region: Russian Federation –

In the city of Krasnodar, the housing and communal service No. 6 of the branch of the Federal State Budgetary Institution “TsZhKU” of the Ministry of Defense of Russia for videoconferencing is completing preparations for the autumn-winter period of 2021-2022 for the communal infrastructure facilities of the military camps of the Ministry of Defense of Russia. In a timely manner, it conducts test furnaces at heating facilities, due to which the readiness of heat supply sources, heating networks and fuel facilities is checked by the beginning of the heating season.

During the testing period, specialists of the housing and communal service No. 6 (Krasnodar) of the branch of the Federal State Budgetary Institution “TsZhKU” of the Ministry of Defense of the Russian Federation for the videoconferencing system within 72 hours assessed the readiness of boiler houses, heating networks, as well as in-house heat supply systems in order to identify hidden defects, with the preparation of the list of identified shortcomings for further organization and control of their elimination before the start of the heating period. Particular attention is paid to checking the operation of boilers, shut-off and control valves, instrumentation, backup equipment and control of the parameters of the coolant at the entrance to the building and the control unit, as well as the heating of risers and heating devices.

At the heat supply facilities of the housing and communal service No. 6 (Krasnodar) of the branch of the Federal State Budgetary Institution “TsZhKU” of the Ministry of Defense of Russia for the videoconferencing, a standard stock of solid and liquid boiler fuel has been formed, designed for winter consumption, which will ensure the operation of heat sources. At present, test furnaces have been carried out at 34 boiler houses, which is more than 60% of the total number of boiler houses.

The area of ​​responsibility of the housing and communal service No. 6 (Krasnodar) of the branch of the Federal State Budgetary Institution “TsZhKU” of the Ministry of Defense of the Russian Federation for videoconferencing includes 37 military camps, more than 143 km. water supply and sewerage networks, about 109 km. heating networks and more than 50 boiler houses.

The service specialists are taking all the necessary measures to ensure that the upcoming heating season passes without technological failures and in normal mode.

1 2 3 4 5

EDITOR’S NOTE: This article is a translation. Apologies should the grammar and / or sentence structure not be perfect.

MIL OSI Russia News