Post sponsored by NewzEngine.com

MIL OSI Translation. Region: Russian Federation –

October 6, 2021, 15:34

Share this

More than 300 residents of the district will receive apartments in the new building.

The house under the renovation program in South Tushino is planned to be transferred for occupancy in the first half of 2022, the head of the capital Department of Urban Development Policy Sergey Levkin.

“Three residential buildings are being built in the district under the renovation program. The approximate deadline for the transfer of new buildings for settlement at the address: Yuzhnoye Tushino, block 11, building 1 – the first half of 2022, “the head of the department noted.

He also recalled that houses in South Tushino have not yet been transferred for settlement. “111 residential buildings are to be resettled on the territory of the district, six of them in the first wave. In total, more than 18 thousand people will receive new apartments, ”added Sergei Levkin.

In Yuzhny Tushino, six launch sites have been selected: construction work is underway at three of them, and three more are at the stage of developing design documentation.

The housing stock renovation program was approved in 2017. It includes 5176 houses, in which about one million Muscovites live. In the capital already built two million square meters of housing.

EDITOR’S NOTE: This article is a translation. Apologies should the grammar and or sentence structure not be perfect.

MIL OSI Russia News