Post sponsored by NewzEngine.com

MIL OSI Translation. Region: Russian Federation –

Specialists of the aviation engineering services of the Far Eastern formation of the long-range aviation command, deployed in the Amur and Irkutsk regions, have launched planned work to prepare aviation equipment for operation in the winter.

A set of seasonal maintenance work is to be carried out on each aircraft. It includes: checking the operability of the main components and assemblies, electrical and hydraulic systems, inspection of engines, fuel tanks, replacement of oils and all technical fluids.

The transfer of equipment is combined with intensive combat training – scheduled flights are performed several times a week in the daytime and at night in various meteorological conditions and the preparation of the aviation formation for a scheduled control check.

Measures for the transfer of aviation equipment for the winter period of operation are planned to be completed by mid-November.

1 2 3 4 5

EDITOR’S NOTE: This article is a translation. Apologies should the grammar and / or sentence structure not be perfect.

MIL OSI Russia News