Post sponsored by NewzEngine.com

MIL OSI Translation. Region: Russian Federation –

12 October 2021, 09:01

Share this

Photo by M. Denisov. Mos.ru

The tunnel will connect the odd and even sides of the Dmitrovskoe highway. You can also go to residential buildings on Yablochkova street.

An underground pedestrian crossing will be built under the tracks of the MCD-1 in the area of ​​house 29, building 1 on Dmitrovskoe highway, said the head Moscow Construction Department Rafik Zagrutdinov

“We plan to complete the work within a year,” he said. “At present, the builders have equipped a household town, work is underway to free up the territory for construction.”

The tunnel, almost 84 meters long, will connect the odd and even sides of the Dmitrovskoe highway. You can also go to residential buildings on Yablochkova street. The crossing will allow residents to cross the paths of the Savelovsky direction of the Moscow railway without risk.

For the convenience of pedestrians, the crossing will be equipped with three lifts, and overhead wheelchair ramps will be made on the stairs. The walls and parapets will be faced with ceramic granite tiles, while the steps and the floor will be made of natural heat-treated granite slabs.

Excavation works are scheduled to start in November. The pedestrian crossing over the railroad tracks will not be blocked during construction.

EDITOR’S NOTE: This article is a translation. Apologies should the grammar and or sentence structure not be perfect.

MIL OSI Russia News