Post sponsored by NewzEngine.com

MIL OSI Translation. Region: Russian Federation –

October 19, 2021 7:12 pm

Share this

Design solution

It will be a four-section building with 110 apartments.

A residential building built using BIM (Building Information Modeling) technologies will appear in the Nagatinsky Zaton area.

“In the area of ​​Nagatinsky Zaton at the address: Sudostroitelnaya street, possession 15 next year, a residential building will be put into operation for resettlement under the renovation program. Currently, the construction of monolithic structures of the underground part of the building is underway, “said the head

Moscow Construction Department Rafik Zagrutdinov.

A four-section building of variable number of storeys is being erected on an individual project… The facades of the building will be faced with clinker tiles, baskets for air conditioners will be installed on them.

The house will have 110 apartments: seven one-room, 92 two-room and 11 three-room. The finished improved finishing in them will meet the standards of the renovation program approved by the Moscow Government.

An underground one-level parking lot will be installed under the yard. The first floor of the building will be non-residential. There will be a lobby, an elevator hall, an attendant’s and inventory storage rooms, and mailboxes. Also, shops, cafes, beauty salons, sports clubs, circles and sections for children will be able to open here.

The house will be equipped with elevators with a lifting capacity of 400 and 630 kilograms with visual and tactile media.

The adjacent territory will be landscaped and landscaped: trees and shrubs will be planted, lawns and flower beds will be laid out, children’s and sports grounds, as well as a recreation area will be equipped.

“This house is being built for the participants of the renovation program. The development of design solutions for the facility was carried out immediately in the BIM model with the subsequent automated release of the necessary drawings and specifications. It is very important that Russian-made software was used to create an information model of a residential building, ”said the head

Department of urban planning policy of the city of Moscow Sergey Levkin.

One of the important innovations was the analysis of the information 3D model, carried out by specialists. Mosgosexpertiza… The experts admitted that the detailed study of the information model and its design solutions meets all standards.

“Using the example of a new building at Sudostroitelnaya, we intend to test the entire technological cycle from design to putting a residential facility into operation using BIM,” said Sergei Levkin.

Digital architecture, or BIM-modeling in construction

Collaboration of designers is carried out in a single digital environment of common data. This allows you to speed up the work, as well as eliminate errors that could have been identified only during the construction phase. A three-dimensional model is created for the object, with the help of which you can change its parameters and automatically receive ready-made drawings, visualizations, specifications and a work schedule.

So, information modeling technologies are used when designing a section of a heating network for a complex of residential buildings that are being built under the renovation program in the Metrogorodok area.

EDITOR’S NOTE: This article is a translation. Apologies should the grammar and or sentence structure not be perfect.

MIL OSI Russia News