Post sponsored by NewzEngine.com

MIL OSI Translation. Region: Russian Federation –

October 30, 2021 11:01 am

Share this

Press Service of the Mayor and the Moscow Government

It is planned to open the station for passengers by the end of this year.

The capital’s power engineers have completed the technical connection to the power grid of the Terekhovo station of the Big Circle Line (BCL) of the metro, which is located in the Khoroshevo-Mnevniki area. This was reported in the municipal economy complex.

To supply the station with electricity, specialists have laid more than a kilometer of cable lines with a voltage of 20 kilovolts.

Networks with a voltage of 20 kilovolts are highly reliable, increase the throughput of the electrical distribution network and reduce energy losses.

The BKL “Terekhovo” station is shallow with two onshore platforms. It will become the main transport facility in the program for the integrated development of the Mnevnikovskaya floodplain, where residential areas and sports facilities are currently being built.

The Terekhovo station is scheduled to open before the end of this year.

Residential, social and business facilities will appear on the territory of the Mnevnikovskaya floodplain

The Big Circle Line is the world’s largest metro construction project. The BCL will be 70 kilometers long and will house 31 stations and three electric depots, including the existing Kakhovskaya – Kashirskaya section. The BCL may become the longest metro ring line in the world, overtaking the current leader – the second ring line of the Beijing metro.

EDITOR’S NOTE: This article is a translation. Apologies should the grammar and or sentence structure not be perfect.

MIL OSI Russia News