Post sponsored by NewzEngine.com

MIL OSI Translation. Region: Russian Federation –

November 21, 2021, 09:05

Share this

Design solution

The four-storey building is being prepared for commissioning.

In the area of ​​Yuzhnoye Butovo, the construction of an educational building for 300 places has been completed. This was announced by the head Moscow City Construction Department Rafik Zagrutdinov… The building is being prepared for commissioning.

The four-storey educational building, intended for secondary school No. 2007, is located at the address: Gorchakova street, house 9, building 1. It is designed for students in grades 5-11.

On the first floor there is a lobby, a security room, dressing rooms and a medical block, on the second there are study rooms, a gym with dressing rooms, an assembly hall and other premises.

On the third floor there are classrooms, the technical center of the assembly hall, a computer science office, and on the fourth floor there are specialized offices, a media center and recreation areas.

The building is equipped with modern equipment for teaching children, there are information boards and clear navigation. The building has all the conditions for the convenience of students with limited mobility.

The new building was designed in the same style as the existing school building – simple functional solutions were used here in combination with panels of different bright colors. The builders used stained glass to decorate the main facade. The total area of ​​the building is about 6100 square meters.

EDITOR’S NOTE: This article is a translation. Apologies should the grammar and or sentence structure not be perfect.

MIL OSI Russia News