Post sponsored by NewzEngine.com

MIL OSI Translation. Region: Russian Federation –

November 27, 2021, 09:05

Share this

It will be erected as part of the project for the reconstruction of the interchange at the intersection with Verkhniye Polya Street.

The longest overhead pedestrian crossing on the Moscow Ring Road (MKAD) will appear at the intersection of the ring road with Novoyegoryevskoye Highway. Its length will be 317.74 meters.

“According to the project for the reconstruction of the interchange at the intersection with Verkhniye Polya Street, the longest overhead pedestrian crossing on the Moscow Ring Road will be built. There are many large retail and commercial facilities in this area, which are visited by a large number of people, “said the head

Moscow City Construction Department Rafik Zagrutdinov

The pedestrian crossing will be located along the left-turn exit from Novoyegoryevskoye Highway to the inner side of the Moscow Ring Road. Two descent towers will be located on both sides of Verkhniye Polya Street, and two others – on both sides of the Moscow Ring Road. Exit from the outer side of the road will allow you to go to a large shopping center at the 14th kilometer of the Moscow Ring Road.

The crossing will be equipped with four elevators, in addition, there will be service rooms and electrical control rooms. It also provides for the installation of a water metering unit and a video surveillance system. Decorative translucent fences will be made on spans and descent towers.

More than 70 kilometers of roads were built in Moscow in 2021

By the end of 2023, it is planned to build 266 kilometers of roads, 88 artificial structures and 54 pedestrian crossings in Moscow.

EDITOR’S NOTE: This article is a translation. Apologies should the grammar and or sentence structure not be perfect.

MIL OSI Russia News