Post sponsored by NewzEngine.com

MIL OSI Translation. Region: Russian Federation –

November 30, 2021, 15:00

Share this

More than 600 people will receive new housing.

In Zyuzin, the settlement of two houses, built under the renovation program, began. This was told by the head of the Department of Urban Development Policy Sergey Levkin

“In the Zyuzino district, more than 600 people (239 families) living in three houses on Malaya Yushunskaya, Odessa and Kherson streets will receive modern apartments with high-quality finishing. New buildings are located within walking distance from the old five-story buildings. They were built in 2021 “, – added the Minister of the Moscow Government, head

City Property Department Maxim Gaman.

Residents of five-story buildings on Malaya Yushunskaya (building 12, building 1) and Odessa streets (building 27/14) will receive apartments at the address: Malaya Yushunskaya street, building 10, building 2. Families from a house on Kherson street (building 12, building 1) – in a new building on Kakhovka street (building 23, building 5).

The first floors of the new buildings are non-residential; objects of social infrastructure will be located here. The courtyards have been landscaped and landscaped, children’s and sports grounds, as well as recreation areas have been arranged.

Zyuzino became the ninth district in the South-West Administrative District, in which resettlement began under the renovation program. Earlier in the south-west of the capital, residents of the Akademichesky, Konkovo, Kotlovka, Obruchevsky, Severnoye and Yuzhnoye Butovo, Cheryomushki, Yasenevo districts received new apartments. In the district, 15 houses have already been built and handed over for settlement under the renovation program. 5.7 thousand people (2.2 thousand families) have moved or are moving there.

According to Sergei Levkin, the renovation program in the South-Western Administrative District included 520 houses, in which more than 117 thousand people (43.6 thousand families) live.

“At the moment, 21 new buildings have already been erected, another 24 houses with an area of ​​about 350 thousand square meters are being built or designed,” he said.

The renovation program was approved in August 2017. It includes 5175 houses. Next year they plan to build about one and a half million square meters of housing.

Sergei Sobyanin spoke about the implementation of the renovation program in the city

EDITOR’S NOTE: This article is a translation. Apologies should the grammar and or sentence structure not be perfect.

MIL OSI Russia News